Gilpin Lodge – Windermere

Embracing Sustainable Hospitality. PSA delivered mechanical and electrical engineering design to help our client, Gilpin Hotel & Lake House, to achieve its sustainability goals with a hybrid heating solution.     CLIENT: Gilpin Hotel & Lake House LOCATION: The Lakes, Cumbria SERVICES: Mechanical & Electrical Design     CLIENT OBJECTIVES The Gilpin Hotel & Lake […]

Lodore Falls Hotel – Keswick

The Lodore Falls Hotel in the Lake District faced high heating costs from two oil boilers. PSA designed and installed a 700kW biomass boiler system with 200 metres of district heating pipework to reduce the hotel’s energy bills and carbon emissions.     CLIENT: Lodore Falls Hotel LOCATION: Keswick, Cumbria SERVICES: Mechanical Design and On-site […]

Padiham Primary School – Burnley

Pettit Singleton Associates (PSA) carried out full mechanical and electrical design and supervision services on this £2.5 million major development to consolidate the infants and juniors schools onto one site. The construction of a new wing on the existing school building totalled some 900m2. A key requirement of the brief was for the building to […]

Blackpool Football Club NHS Offices

Delivering Sustainable Solutions for Blackpool Football Club’s NHS Offices. Sustainable design and engineering are at the heart of what we do at PSA. When Blackpool Football Club approached us to collaborate on the creation of new NHS offices within their stadium, we were excited to put our expertise to work and deliver a truly impactful […]