Crow Wood Hotel & Spa – Woodland Spa

About this project

Within the Crow Wood Leisure complex, The Woodland Spa has developed into a luxury of relaxation and wellness. Our team at PSA provided a full detailed mechanical and electrical design for it’s £20m refurbishment. Luxury and sustainability were top priorities for the client. The Spa now welcomes visitors from all over who enjoy the beautiful views of countryside in comfort.

 


 

 

CLIENT: Crow Wood Hotel and Spa

VALUE:  £20m

LOCATION: Burnley, Lancashire

SERVICES: Mechanical & Electrical Design

 


 

CLIENT OBJECTIVES

The Woodland Spa aimed to create a world-class wellness facility that would stand out in the competitive spa industry. They envisioned a space where cutting-edge technology would enhance the guest experience without compromising the serene environment. A spa of this size and calibre takes a lot of services in the background to operate, so finding solutions that helped keep costs and carbon footprint down were important.

 

OUR SOLUTION

Having already had a long-standing relationship with the client, being involved in both the original spa and hotel build in the past, meant we were called upon to provide a full detailed design for the Mechanical and Electrical services.

Our designs included the provision of:

  • Air source heat pumps to generate heating and hot water
  • Solar photovoltaic panels
  • Ventilation and comfort systems
  • Swimming pool ventilation
  • Fire safety systems
  • CCTV and security
  • Building Management System
  • DALI lighting controls
  • Specialist lighting design
  • 3D Revit design

 

We worked around the operating spa while the refurbishment was taking place so it only had to close for a minimum amount of time. Our team worked closely with the design team and the contractor to ensure seamless delivery.

 

THE OUTCOME

The result is a stunning spa that seamlessly marries luxury with sustainability. Guests now enjoy a wellness experience enhanced by our carefully designed systems working quietly in the background. Our ongoing relationship with the client has led to further projects, including the consultation of solar PV panels, further cementing the spa’s commitment to green energy and reduced operating costs.

 

“PSA have been a trusted partner for us since the first iteration of Crow Wood over 20 years ago, through to the more recent £20m transformation. They have provided design consultancy for our building services for 90% of the development from the initial gym, squash and tennis courts, swimming pool, equestrian centre and hotel. PSA ensure our construction work is completed to the highest of quality, safety and accuracy. We trust their advice on all building services, they respond quickly and professionally to issues and do all they can to provide honest and direct advice to help us achieve the high-quality finish at the right price.”

Oliver Brown – Director

 

Photos courtesy of: Crow Wood Hotel & Spa